Author | Title | Vol | Date | PP | |
M.Esmaeili, Mir-Bahador Aryanaezhad , P.Zeephongsekui | European Journal of Operational Research | 195 | 2009 | 442-448 | |
Article | A game theory approach in seller- buyer supply chain | ||||
Arshia Ahi,Mir.B.Aryanezhad, | Computer & operations Research | 36 | 2009 | 1478-1496 | |
Article | A novel approach to determine cell formation, intracellular machine layout and cell layout in the CMS problem based on TOPSIS method | ||||
Mehdi ghazanfari,Adel Alaeddini, SeyedTahi Akhavan Niaki , Mir-Bahador Arynezhad | Quality and Reliability Engineering International | 24 | 2008 | 765-778 | |
Article | A Clustering Approach to Identify the time of a step change in shewhart control charts | ||||
Rassoul Noorossana and Alireza Shadman | Quality And Reliability Engineering International | 25 | 2009 | 79-90 | |
Article | Estimating the Change point of a Normal Process Mean with a Monotonic Change | ||||
V.R.Ghazavati, M.S.Jabal-Ameli, A.Makui | Expert systems with Applications | 36 | 2009 | 5620-5629 | |
Article | A new heuristic method for distribution networks considering service level constraint and coverage radius | ||||
Ramin Sadeghian and Gholam Reza Jalali-Naini | Dynamics of Continuous Discrete and Impulsive Systems | 15 | 2008 | 395-416 | |
Article | Applying Semi-Markov Models For Forecasting the Triple Dimensions of Next Earthqu AKE occurrences | ||||
R.Tavakkoli-Moghaddam, A.Makui, S.Salahi, M.Bazzazi, | Computer & Industrial engineering | 56 | 2009 | 241-248 | |
Article | An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports | ||||
M.K.Ardakhani, R.Noorassana, S.T.Akhavan niaki, H-Lahijanian | Inter.J. of applied mathematics and computer science | Vol.19 ISSue.1 | 2009 | 59-68 | |
Article | Robust parameter design using the weighted metric method- the cost of the smaller the better | ||||
Mohammad Fathian , Seyed J.Sadjadi, Samaneh Sajadi | Computers & Industrial Engineering | 56 | 2009 | 255-259 | |
Article | Optimal Pricing model for electronic Products | ||||
S.J.Sadjadi , H.Omrani | Energy Policy | 36 | 2008 | 4247-4254 | |
Article | Data envelopment analysis with uncertain data: An application for Iranian electricity distribution companies | ||||
Fardin Ahmadizar, Mehdi Ghazanfari , seyed Mohammad Taghi Fatemi | Int J Adv Manuf Technol | 24 | 2009 | 321-334 | |
Article | Applictioan of chance-constrained programming for stochastic group shop scheduling problem | ||||
S.J.Sadjadi, M.Jafari, T.amini | Int J Adv Manuf Technol | Vol.44 | 2009 | 200-210 | |
Article | A new mathematical modeling and a genetic algorithm search for milk run problem (an auto industry supply chain case study ) | ||||
M.Saidi Mehrabad , A..Pahlavani | Int J Adv Manuf
|
|
2009 |
| |
Article | A Fuzzy multi-objective programming for scheduling of weighted jobs on a single machine | ||||
Mohammad Saeed Jabal Ameli , Jamal Arkat, Farnza Barzinpour | Int J Adv Manuf Technology | 39 | 2008 | 838-850 | |
Article | Modeling the effects of machine breakdowns in the generalized cell formation problem | ||||
Mohammad Fthian, Babak Amiri | Int J.Adv Manuf Technol | 38 | 2008 | 809-821 | |
Article | A honeybee- mating approach for cluster analysis | ||||
R.Fekri, A.Aliahmadi, M.Fathian | Int J.Adv Manuf Technol | Vol.41 ISSue 11-12 | 2009 | 1240-1260 | |
Article | predicting a model for agile NPD Process with fuzzy cognitive map | ||||
Hassan rezazadeh, Mehdi Ghazanfari, Mohammad Saidi-Mehrabad , SeyedJafar Sadjadi | Journal of zhejang University Science | 10(4) | 2009 | 520-529 | |
Article | An extended discrete particle swarm optimization algorithm for the dynamic facility layout problem | ||||
Seyed Mohammad Seyed Hoseini, Simak Noori , Mohammad Ali Aatefi | Kuwait Journal of Science & Engineering | 35 (2B) | 2008 | 1-21 | |
Article | An Integrated decision support system for project risk response planning | ||||
Majid Sabzehparver, S.Mohammad Seyed-Hosseini | J Supercomputer | 44 | 2008 | 257-273 | |
Article | A mathematical model for the multi- mode resource-constrained project scheduling problem with mode dependent time lags | ||||
S.Ghazinoory, A.Aliahmadi, S.Namdarzangeneh, S.H. Ghodsypour | Applied Mathematics
| Vol. 184 ISSue 2 | 2007 | 316-321 | |
Article | Using AHP and L.P. for choosing the best alternatives based the gap analysis | ||||
Mohammad Fathian , Peyman Akhavan, Maryam Hoorali | Technovation | 28 | 2008 | 578-590 | |
Article | E-readiness assessment of non-profit ICT SMEs in a developing country: the case of Iran | ||||
S.noori, M.R.Feylizadeh, M.Bagherpour, and R.M.Parkin | P Imech Eng.B-J Eng | Vol. 222 No.7 | 2008 | 887-900 | |
Article | Optimization Of material requirement planning by fuzzy multi-objective linear programming | ||||
S.Noori, M.Bagherpour, F.Zorrialssatine, A.Makui, and R.Parkin | P Imech Eng.B-J Eng | Vol. 222 No.11 | 2008 | 1517-1527 | |
Article | A New Project scheduling approach for improving multi-product multi-period production planning problems | ||||
Mohammad kazem sayadi, Majeed Heydari, Kamran Shahanaghi | Applied Mathematical Modelling | 33 | 2009 | 2257-2262 | |
Article | Extension of VIKOR method for decision making problem with interval numbers | ||||
Seyed Mohammad Seyedhoseini , Siamak Noori, and Mohammad ali Hatefi | Risk Analysis | Vol.29 No.5 | 2009 | 752-763 | |
Article | An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions | ||||
R.Khosravanian, M.B.Aryanezhad, A.Makui, B.S.Aadnoy , A.Naderifar | Oil And Gas Journal | Vol. 107.1 | 2009 | 40-47 | |
Article | Modeling optimizes casing points in Persian gulf wells | ||||
Behzad Ashtiani, Farzad Haghighirad, Ahmad Makui, Golam ali Montazer | Applied soft computing | Vol.9 ISSue 2 | 2009 | 457-461 | |
Article | Extension of fuzzy TOPSIS method based on interval-valued fuzzy sets | ||||
Ata Allah Taleizadeh , Seyed Taghi Akhavan Niaki ,Mir-Bahador Aryanezhad | Mathematical and Computer Modelling | 49 | 2009 | 1044-1057 | |
Article | A hybrid method of Pareto,TOPSIS and Genetic algorithm to optimize multi-Product multi-constraint inventory control systmes with random fuzzy replenishments | ||||