Mr. Behnam Karimi, a Ph.D. candidate in Industrial Engineering, will defend his dissertation entitled “Integrated Planning of Procurement, Production, Distribution, and Installation in Construction Project Supply Chains with the Participation of an Innovative Fourth-Party Logistics Provider: A Case Study”, under the supervision of Dr. Mohammad Mohammadpour Emran.
Dissertation Committee: Dr. Mohammad Mohammadpour Emran, Dr. Hadi Sahebi, Dr. Ebrahim Teymouri, Dr. Saeed Yaghoubi, Dr. Ali Bozorgi Amiri, Dr. Seyed Mohammad Javad Mirzapour Al Hashem
Defense Details:
Date: November 18, 2026
Time: 7:30 AM
Venue: Classroom 208, Second Floor
Student ID: 98873059
Email: karimi_be
ind.iust.ac.ir
Abstract:
The prefabricated construction industry involves a complex network of suppliers, manufacturers, logistics service providers, and installation teams whose decisions regarding procurement, production capacity, transportation, delivery, and installation are strongly interdependent. The multi-project nature of this industry, temporal concentration of demand, capacity heterogeneity, and organizational independence may lead to locally optimal decisions that do not necessarily improve overall supply chain performance. In this context, fourth-party logistics (4PL) can act as a network coordinator to integrate decisions and improve the utilization of dispersed capacities.
Accordingly, this research develops a framework of mathematical models for integrated procurement, production, transportation, delivery, and installation planning in a multi-project prefabricated construction supply chain coordinated by 4PL. A centralized model is first developed as a benchmark, followed by alternative decision-making and coordination structures including a hierarchical leader-follower model, an uncoordinated decentralized structure, coordination mechanisms based on profit sharing, capacity reservation, penalty-reward schemes, and a hybrid contract, as well as horizontal cooperation among manufacturers. Scenario-based programming, Conditional Value-at-Risk (CVaR), and rolling-horizon planning are also employed to incorporate uncertainty. The proposed models are implemented using a real-world case study from Iran's steel structure industry, comprising eight projects, ten suppliers, six manufacturers, four 3PL providers, four hubs, and four installation teams, with a total demand of 6,880 tons over a 16-week horizon.
The results show that the centralized model achieves a total network cost of IRR 749,592.60 million, a service level of 97.06%, and an on-time project completion rate of 87.5%, while in the uncoordinated structure the service level decreases to 93.51% and only 50% of projects are completed on time. Horizontal cooperation and coalition formation recover 69.47% of the cost شکاف caused by lack of coordination, with the grand coalition generating IRR 3,574.6 million in value. The hybrid contract also reproduces the 97.06% service level of the centralized model. Sensitivity analyses indicate that demand is the main driver of network cost, whereas production and shareable capacity have stronger effects on service level and delay. Overall, the findings show that much of the inefficiency arises from temporal and organizational mismatches between project demand and network resources, which can be mitigated through 4PL-based information integration, contract design, and coordinated capacity management.
Keywords: Prefabricated construction supply chain; Integrated planning; Supply chain decision-making and coordination; Fourth-party logistics (4PL); Multi-project environment; Contractual coordination; Horizontal cooperation; Uncertainty; Steel structure industry.